• 2025.10.24 (Fri)
  • All articles
  • LOGIN
  • JOIN
Global Economic Times
APEC2025KOREA가이드북
  • Synthesis
  • World
  • Business
  • Industry
  • ICT
  • Distribution Economy
  • Korean Wave News
  • Opinion
  • Arts&Culture
  • Sports
  • People & Life
  • Lee Yeon-sil Column
  • Ko Yong-chul Column
  • Photo News
  • New Book Guide
  • Cherry Garden Story
MENU
 
Home > World

Lithuania to Resolve Issues Holding Back High-Tech Park Project with Taiwan

Graciela Maria Reporter / Updated : 2024-11-20 14:19:15
  • -
  • +
  • Print


Lithuania's government has pledged to resolve the issues that have stalled a high-tech industrial park project aimed at fostering closer ties with Taiwan in the semiconductor sector. The project, which was to be built at the Teltonika High-Tech Hill park, faced delays due to unresolved land use and energy supply issues.

Last Friday, Arvydas Paukštys, a major shareholder of Teltonika, took to LinkedIn to announce that construction on the project had been halted due to these obstacles. However, following a meeting between government officials and Paukštys on Monday, Lithuanian Prime Minister Ingrida Šimonytė instructed government agencies to support Teltonika in moving the high-tech park project forward.

After the meeting, Paukštys stated that the project, originally slated for completion in 2028, is now expected to be delayed by two to three years, with completion potentially pushed back to 2032 if no further issues arise.

Ausrine Armonaite, Lithuania's Minister of Economy and Innovation, echoed Paukštys' sentiments, emphasizing the need for the government to collaborate with 18 institutions, including the military, to resolve the land use issues. Armonaite noted that the government has addressed the technical challenges related to the project and is currently working on the necessary paperwork to move forward.

Paukštys had previously stated in his LinkedIn post that Teltonika was unable to even begin designing the 55-hectare industrial park building, which was expected to house 10 major facilities, due to a lack of clarity on the technical requirements of the park.

In January of last year, Taiwan's Industrial Technology Research Institute (ITRI) signed a €14 million (US$14.77 million) contract with Teltonika to establish semiconductor production capabilities at the Lithuanian park. This agreement was part of Taiwan's efforts to help the Baltic nation develop the capacity to produce 8-inch wafers.

Teltonika, designated as part of Lithuania's "national chip team," is a major supplier of Internet of Things devices in Lithuania. The Lithuanian National Radio and Television reported last week that Paukštys had accused the Lithuanian government of blocking a €3.5 billion investment in the project.

In his LinkedIn post, the Lithuanian businessman claimed that halting the investment would prevent the creation of 6,000 new jobs and result in billions of euros in lost GDP for the country.

Following news of the construction halt, Taiwan's Ministry of Foreign Affairs stated on Saturday that semiconductor development cooperation with Lithuania would not be affected.

[Copyright (c) Global Economic Times. All Rights Reserved.]

Graciela Maria Reporter
Graciela Maria Reporter

Popular articles

  • Deadly Clan Clashes Erupt in Gaza as Israeli Forces Withdraw

  • Global Echoes of the Harvest Moon: A Look at Family and Ancestral Holidays

  • China's Tsinghua University Tops Global Computer Science Rankings, Signaling a Shift in Tech Dominance

I like it
Share
  • Facebook
  • X
  • Kakaotalk
  • LINE
  • BAND
  • NAVER
  • https://globaleconomictimes.kr/article/1065590321261385 Copy URL copied.
Comments >

Comments 0

Weekly Hot Issue

  • LG Electronics Launches 'ThinQ ON' AI Home Hub to Lead Smart Home Market
  • Supersonic 'Hyperloop' Poised to Shrink South Korea, Cutting Seoul-Busan Trip to 20 Minutes
  • Traffic Congestion Levy Stifles Support for Small Businesses
  • S. Korea Ramps Up Cybersecurity with Sweeping Measures
  • Gmarket Challenges E-Commerce Leaders Coupang and Naver with 700 Billion Won Investment and Alibaba Synergy
  • Arc Flash Horror: Uncertified Adapter Blamed for Fiery Tesla Charging Explosion in Canada

Most Viewed

1
Early Winter Chill Grips South Korea as Seoraksan Sees First Snow
2
McDonald's 'Subtle Racism' Controversy: Korean American Denied Order After 70-Minute Wait
3
Gyeongju International Marathon Elevated to 'Elite Label' Status, Welcomes Record 15,000 Runners  
4
K-Webtoons Emerge as a Mainstream Force in North American Pop Culture: Report from New York Comic Con 2025
5
Deadly Clan Clashes Erupt in Gaza as Israeli Forces Withdraw
광고문의
임시1
임시3
임시2

Hot Issue

Chinese Researchers Unveil Ultra-Fast Analog Chip, Targeting 1,000x Nvidia Speed

Melody in the OR: Parkinson's Patient Plays Clarinet During Brain Surgery

South Korean Chip Titans Clash Over Next-Gen HBM4 Memory

South Korea to Launch Government-Led AI Certification to Combat Market Confusion

Let’s recycle the old blankets in Jeju Island’s closet instead of incinerating them.

Global Economic Times
korocamia@naver.com
CEO : LEE YEON-SIL
Publisher : KO YONG-CHUL
Registration number : Seoul, A55681
Registration Date : 2024-10-24
Youth Protection Manager: KO YONG-CHUL
Singapore Headquarters
5A Woodlands Road #11-34 The Tennery. S'677728
Korean Branch
Phone : +82(0)10 4724 5264
#304, 6 Nonhyeon-ro 111-gil, Gangnam-gu, Seoul
Copyright © Global Economic Times All Rights Reserved
  • 에이펙2025
  • APEC2025가이드북TV
  • 세종시
Search
Category
  • All articles
  • Synthesis
  • World
  • Business
  • Industry
  • ICT
  • Distribution Economy
  • Korean Wave News
  • Opinion
  • Arts&Culture
  • Sports
  • People & Life
  • Lee Yeon-sil Column
  • Ko Yong-chul Column
  • Photo News
  • New Book Guide
  • Cherry Garden Story
  • Multicultural News
  • Jobs & Workers
  • APEC 2025 KOREA GUIDE