• 2026.11.19 (Thu)
  • All articles
  • LOGIN
  • JOIN
Global Economic Times
한인동포뉴스(상단)
  • Synthesis
  • World
  • Business
  • Industry
  • ICT
  • Distribution Economy
  • Well+Being
    • Pet Life
    • Halal Horizon
  • Travel
  • Eco-News
  • Education
  • Korean Wave News
  • Opinion
  • Arts&Culture
  • Sports
  • People & Life
    • International Student Report
    • With Ambassador
  • Column
    • Cho Kijo Column
    • Cherry Garden Story
    • Ko Yong-chul Column
    • Kim Bong-seon's Photo Column
    • Kim Seul-Ong Column
    • Lee Yeon-sil Column
    • Professor Lee Soo-young’s Life Essays
  • Photo News
  • New Book Guide
MENU
 
Home > ICT

Datacenters to Consume 7% of Global Electricity by 2035... US Gas Power Plans vs. South Korea’s Decentralized Siting

Global Economic Times Reporter / Updated : 2026-11-18 11:43:27
  • -
  • +
  • Print


The global electricity demand for data centers is projected to surge nearly fourfold by 2035, accounting for 7% of total global power consumption.

In the United States, developers are increasingly turning to on-site gas-fired power plants to accelerate operations rather than waiting for grid connections. Meanwhile, South Korea has tightened power grid impact assessment standards for the capital region to disperse new demand toward areas with spare electricity supply capacity.

According to a report published on the 11th by BloombergNEF (BNEF)—commissioned by Bloomberg Philanthropies—global annual electricity demand for data centers is expected to reach 2,354 TWh by 2035.

Under a baseline scenario based on announced projects, data center power demand is projected to double by 2030 and grow nearly fourfold by 2035 compared to 2026 levels.

In the US and Europe, shortages of transmission lines and substation facilities capable of absorbing massive power demands have delayed new grid connections.

Consequently, some developers have chosen to build gas-fired power plants directly on facility sites instead of waiting for grid reinforcements. Starting data center operations sooner allows them to rent out computing hardware and generate revenue earlier.

US On-Site Gas Power Plans Could Emit 345 Million Tons Annually if Fully Realized

BNEF tracked 181 GW of planned on-site gas power projects for data centers globally, with over 90%—amounting to 165 GW—concentrated in the US. Because projects are at various stages of progress and timelines, these announced capacities do not necessarily reflect final construction volumes.

Assuming all announced US plans materialize and the power plants operate at an average capacity factor of 60%, annual greenhouse gas emissions are estimated at approximately 345 million metric tons of carbon dioxide equivalent.

This figure is about 152 million tons higher per year than if the same data centers were supplied with electricity based on the average emission intensity of the US power grid. This additional emission volume equals roughly 10% of total emissions from the entire US power sector in 2025.

Most developers contacted by BNEF view on-site gas generation as a temporary measure—lasting five to seven years or until grid connection is achieved.

However, once built, if fuel costs and variable operating expenses remain lower than purchasing electricity from the grid, it may prove financially advantageous to keep operating the power plants. BNEF pointed out that temporarily introduced gas power could linger even after grid interconnection, potentially prolonging fossil fuel dependence.

US Seeks to Cut Connection Backlogs; South Korea Strengthens Capital Region Siting Criteria

BNEF reviewed grid connection policies across 17 markets. Strategies included requiring financial deposits to filter out low-feasibility applications or fast-tracking connections on the condition that users reduce consumption during grid congestion.

In Ohio, US, after a utility introduced a separate tariff tier for large power consumers, the queue backlog plummeted from over 30 GW to 13 GW. However, BNEF noted that a shrinking queue size is distinct from faster actual interconnections, and empirical data validating the effectiveness of many such policies remains insufficient.

South Korea has overhauled its regulatory framework to disperse heavy power demand concentrated around the Seoul metropolitan area. The Ministry of Climate, Energy and Environment implemented a revised operational notice on power grid impact assessments on the 16th, raising the passing threshold for capital region data centers from 70 to 75 points. The evaluation primarily targets applicants seeking to consume 10 MW or more of electricity through contracts with electric sales licensees.

Previously, the government announced plans to fast-track grid impact assessments for non-metropolitan AI data centers and disclose information regarding 345 kV substations with spare capacity.

Whether these tightened capital region siting requirements will successfully translate into investments outside the capital area and how much they can accelerate power supply timelines remain tasks to be verified following the policy's implementation.

Faster Connections Do Not Always Guarantee Lower Emissions Depending on Generation Sources

BNEF emphasized that accelerating grid interconnections is not a universal solution for reducing emissions across all markets. While Brazil faces transmission constraints, renewable energy is expected to supply the vast majority of incremental generation required for data center demand growth through 2035.

Conversely, in India, data center power demand is projected to jump from 11 TWh in 2025 to 91 TWh in 2035, with existing coal-fired power plants expected to shoulder a significant share of the increased demand in the short term.

In Indonesia, coal and gas accounted for 82% of the national utility PLN’s grid power supply in 2025. Another constraint is that data centers are prohibited from entering into direct power purchase agreements (PPAs) with external renewable energy developers.

While direct purchases are permitted in Malaysia, data center power demand is forecast to surge from 7 TWh in 2025 to 45 TWh in 2035, which is expected to drive increased short-term operation of existing coal and gas-fired plants.

In the US and Europe, accelerating grid connections reduces the incentive for data centers to build on-site gas power plants. However, in markets heavily reliant on coal, failure to expand clean power supplies could cause faster new data center connections to trigger increased utilization of legacy coal generation.

[Copyright (c) Global Economic Times. All Rights Reserved.]

  • #Cherry Garden
  • #HalalFood
  • #Halal
  • #Petlife
  • #Halalhorizone
  • #Hormuz Impasse
  • #Joseon
  • #globaleconomictimes
  • #micore
Global Economic Times Reporter
Global Economic Times Reporter
Reporter Page

Popular articles

  • World Citizens are Flying Directly to Busan... The Era of 4 Million Foreigners is Just Around the Corner

  • Restoring Hearing with Genes, Cochlear Implants with Robots: Where Does Hearing Loss Treatment Stand Today?

  • Cold Wave and Autumn Chill Hit Korea on "Ipdong": Gangwon -6°C, Seoul Real-Feel -4°C… Rain and Snow Expected in Central Regions on Sunday

I like it
Share
  • Facebook
  • X
  • Kakaotalk
  • LINE
  • BAND
  • NAVER
  • https://globaleconomictimes.kr/article/1065580916315403 Copy URL copied.
Comments >

Comments 0

Weekly Hot Issue

  • AI Music Tops Melon Chart: Is the K-Pop Production Formula Changing?
  • Beyond the Crossroads: How South Korea Can Forge a New Order in an Age of Global Upheaval
  • Pohang Struggles to Safeguard Its Hanji Heritage Amid Aging Artisans and Shifting Markets
  • KOGAS Chief Calls for Gas Price Adjustments to Clear Massive Backlog of Unpaid Bills
  • South Korea and China Reach Landmark Service and Investment FTA Agreement Translation
  • KDI Forecasts "Nearing 4% Growth" Next Year Despite Export Slowdown—Here’s Why

Most Viewed

1
South Korea and Ethiopia Sign Trilateral MOU to Introduce Liquid-Based Cytology (LBC) Technology for Cervical Cancer Diagnosis
2
Meeting Christmas Early!… Busan Dessert Sales Event "Daldal The Market" Held
3
World Citizens are Flying Directly to Busan... The Era of 4 Million Foreigners is Just Around the Corner
4
Eating 100g of Baechu Kimchi Daily Linked to Lower High-Cholesterol Risks
5
First Snow and Freeze Hit Korea as Winter Officially Begins on 'Ipdeong'
체리가든 스토리
nutri huevos
로타리
동포저널

Hot Issue

ASEAN Summit Wraps Up: Trump Holds Back-to-Back Talks with Quad and Southeast Asian Leaders

"Chilean Wine is More Than Just Cabernet Sauvignon"… Cono Sur Bets Big on Pinot Noir

"Semiconductor Boom Drives Exceptional Growth": IMF Lifts South Korea’s 2026 Growth Outlook to 3.9%

Fashion Runway Show 2026

Let’s recycle the old blankets in Jeju Island’s closet instead of incinerating them.

Global Economic Times
korocamia@naver.com
CEO : LEE YEON-SIL
Publisher & Editor : KO YONG-CHUL
Registration number : Seoul, A55681
Registration Date : 2024-10-24
Youth Protection Manager: KO YONG-CHUL
Singapore Headquarters
5A Woodlands Road #11-34 The Tennery. S'677728
Korean Branch
Phone : +82(0)10 4724 5264
#304, 6 Nonhyeon-ro 111-gil, Gangnam-gu, Seoul
Copyright © Global Economic Times All Rights Reserved
  • News K
  • 반달곰 프로젝트
  • 광고문의
Search
Category
  • All articles
  • Synthesis
  • World
  • Business
  • Industry
  • ICT
  • Distribution Economy
  • Well+Being 
    • 전체
    • Pet Life
    • Halal Horizon
  • Travel
  • Eco-News
  • Education
  • Korean Wave News
  • Opinion
  • Arts&Culture
  • Sports
  • People & Life 
    • 전체
    • International Student Report
    • With Ambassador
  • Column 
    • 전체
    • Cho Kijo Column
    • Cherry Garden Story
    • Ko Yong-chul Column
    • Kim Bong-seon's Photo Column
    • Kim Seul-Ong Column
    • Lee Yeon-sil Column
    • Professor Lee Soo-young’s Life Essays
  • Photo News
  • New Book Guide
  • Overseas Koreans
  • Multicultural News