Degraded Cheonsu Bay to Be Revived as a ‘Clean Sea Area’
Kim Young Min Reporter
sskyman77@naver.com | 2026-11-27 12:10:55
Chungcheongnam-do (South Chungcheong Province) has established a four-stage roadmap centered on the ecological restoration of Lake Bunam to revive Cheonsu Bay—where water quality deterioration and fishery damages caused by freshwater lake discharges have repeatedly occurred—into a "clean sea area."
Im Seong-beom, Acting Director-General of the Marine and Fisheries Bureau of Chungcheongnam-do, held a press conference at the provincial government press center on the 27th and announced the "Cheonsu Bay Clean Sea Area Restoration and Utilization Plan," stating, "The fundamental solution to saving Cheonsu Bay is to first improve the water quality of Lake Bunam and then implement phased seawater circulation."
The draft plan includes: ▲ Stage 1: Creating conditions for project promotion; ▲ Stage 2: Improving water quality through Lake Bunam watershed management; ▲ Stage 3: Phased seawater circulation and ecological restoration; and ▲ Stage 4: Transforming Cheonsu Bay into a landmark enjoyed alongside future generations.
Cheonsu Bay is a semi-enclosed inner bay spanning four cities and counties—Taean, Seosan, Hongseong, and Boryeong—and is the only bay in the province bordering four freshwater lakes: Lake Bunam, Lake Ganwol, Lake Hongseong, and Lake Boryeong.
Due to its shallow depth, slow current, and accumulated sediment, seawater circulation is poor. While its annual average water quality is normally at a "Good" level (Grade II), opening the sluice gates of the freshwater lakes causes it to temporarily deteriorate to "Fair" or "Very Poor" levels (Grades III–V).
As a result, fishery damages occurred in the upper reaches of Cheonsu Bay in 2020, and damages have continued to repeat, such as massive floating debris and foul odors occurring in the Changni sea area of Seosan in July of this year.
To improve Cheonsu Bay's water quality, the province previously established the "Basic Plan for Lake Bunam Estuary (Tidal Flat) Restoration" in 2019 and prepared a revised plan in 2021 to pass the preliminary feasibility study, but failed to draw participation from central government ministries.
This was due to the high difficulty of the project and concerns over marine environment and fishery damages in the event of failure. Accordingly, the province plans to secure pan-governmental cooperation at the national level based on the case of Lake Sihwa, which was promoted by forming a pan-ministerial consultative body led by the Office for Government Policy Coordination.
The core of Stage 1 of the four-stage roadmap is to propose to the central government the establishment of a pan-ministerial integrated promotion system—overseen by the Office for Government Policy Coordination with the participation of the Ministry of Climate, Energy and Environment, the Ministry of Agriculture, Food and Rural Affairs, and the Ministry of Oceans and Fisheries—and to secure momentum by cooperating with the National Assembly and the Provincial Council.
Stage 2 focuses on improving water quality through watershed management, aiming to raise Lake Bunam's water quality to a level suitable for fishing, tourism, and leisure (Grade II).
The province plans to pursue the restoration of Taeancheon Stream, a tributary flowing into Lake Bunam, through a public contest for integrated and intensive polluted stream improvement projects, and will consult with Hyundai Engineering & Construction and the Ministry of Agriculture, Food and Rural Affairs to carry out projects such as dredging sediment from the bottom of Lake Bunam.
Stage 3 involves improving water quality through phased seawater exchange utilizing drainage sluice gates and seawater circulation facilities, followed by restoring the area into a brackish water zone and tidal flats.
Finally, Stage 4 plans to maintain the agricultural water supply function in the northern freshwater zone while restoring tidal flats in the southern brackish water zone to create a waterfront and ecological space for experiential fishing and angling, thereby expanding the income base for local residents.
To consistently implement this roadmap, the province will form the "Lake Bunam Ecological Restoration (Seawater Circulation) Task Force (TF)" headed by the Vice Governor for Administrative Affairs and build a cooperative system, including sharing tasks across departments.
In addition, to prepare for abnormal phenomena in the Cheonsu Bay area, a prior consultation body for freshwater lake discharges—comprising local residents, representatives of farmers and fishermen, the Korea Rural Community Corporation, and Hyundai Engineering & Construction—will be formed and operated to hold prior consultations on discharge volume, timing, and methods, and to share discharge information before releasing water.
Furthermore, a joint inspection team with relevant departments from Seosan and Taean will be operated to intensively inspect the application of unsuitable compost and liquid fertilizer in the Lake Bunam watershed, focusing on the peak application seasons (February–March and November–December).
Acting Director-General Im Seong-beom said, "Creating a clean sea area in Cheonsu Bay cannot be achieved by the strength of a single department or ministry alone," adding, "Centered around the task force, relevant provincial departments will pool their capabilities and actively persuade central ministries and the National Assembly to establish a government-level promotion system, thereby reviving Cheonsu Bay as a clean sea enjoyed by all provincial residents."
[ⓒ Global Economic Times. 무단전재-재배포 금지]
WEEKLY HOT
- 1Hyundai Unveils Mercury-Inspired 'Mercury Concept' in World Premiere
- 2Elon Musk Urges Long-Term Hold on SpaceX Stock, Envisions $9.5 Billion Share Price
- 3Lawmakers Slam Education Ministry Over Unprepared Exam Cheating Crackdown and Improper Destruction of CSAT Papers
- 4Averaging 100 Cases a Month, AI Hacking Threats Become Reality… PIPC Says "AI Defense Requires Investment"
- 5South Korea Repatriates Six Adrift North Koreans via Sea; One Chooses to Defect
- 6Ttareungyi, Tashu, Nubija, and Eoulling Gather in One Place… Joining Hands for a Leap Forward in Public Bike Services